The site required a water treatment solution to manage storm and surface water runoff, meeting safe discharge levels for pH and suspended solids.


Treatment capacity:

Up to 200 m³/hr


Categories
Water treatment

On 2 November 2026, Ecologia Environmental Solutions, RemedX, RSK Raw, RSK Response and RSK IWS came together as Penta Environmental. The new organisation combines specialist expertise in environmental response, remediation and water treatment, giving clients across the UK access to broader capabilities and greater capacity.

Project overview

RemedX designed and built a bespoke water treatment plant to treat storm and surface water runoff. The goal of the project was to conceptualise, design and develop a methodology and treatment system that could handle varying flow rates and effectively manage the alkalinity and associated by-products within the wastewater.

Following the conceptualisation and preliminary design phase, the primary focus shifted to detailed design work and modifications for the implementation and construction phases of the treatment system, which were completed over a 12-month period. The plant is fully automated and integrates real-time pH and flow monitoring with CO2 dosing technology, allowing adaptive treatment performance under varying rainfall conditions.

The water treatment plant ensures that the treatment of runoff water and drainage water meets safe discharge levels for pH and suspended solids before it is returned to the nearby river.

  • 200 m3 hour treatment capacity, optimised for rainfall-driven variability
  • 6.5 m deep pumping station with three high-capacity submersible pumps
  • 3 x 80m3 bespoke designed and built lamella separators
  • More than 160 m of fully insulated and trace-heated above-ground pipework

Multidisciplinary approach and strategy

The site required a water treatment solution to manage storm and surface water runoff that ensured water being discharged was within pH and total suspended solids requirements for discharge.

With the variety of skills required for the project, many businesses from across the RSK Group contributed. RemedX led the project, delivering system and civil design, installation, equipment fabrication and commissioning. ACIES supported the civil design, RSK Advantage supported with contract management, while RSK Response provided installation support and Structural Soils assisted with design drawings.

As part of the extensive ground investigations, CS2 conducted condition surveys, Centara conducted ground-penetrating surveys and Central Alliance conducted plate load testing. Envirolab provided lab testing of samples to establish the condition of the water for discharge.

The challenges

  1. The first challenge on site was establishing water flow rates that required treatment, which were unknown at the start of the project.
  2. The size and location of the site also created challenges in the placement of the water treatment plant. The original water outfall pipe was located 4 m below ground, meaning it could not be easily intercepted and directed into the water treatment plant. Overhead power lines and nearby trees further constrained the design and created plant access issues. The proximity of trees meant root infiltration into the bunded slab was a concern.
  3. The site was located near a marine environment, so all equipment and tanks needed to be designed to deal with high saline conditions to ensure their longevity.

The solution

Using a combination of flow sensors and 20 years of Met Office rainfall data, the design flow characteristics were established to determine an appropriate treatment capacity. A plant capable of processing 200 m3 of water per hour was selected, as this provided sufficient capacity to manage 98% of expected flow conditions under all but extreme events, in agreement with the Environment Agency. A CO₂ dosing system was designed to dynamically adjust injection rates in response to real-time pH and flow data, ensuring accurate and efficient treatment.

To connect with the existing outfall, a dedicated pumping station was constructed 6.5 m below ground, with a designated landing platform that housed all the electrical components, a dedicated manhole entry chamber and the installation of three submersible pumps that would pump water underground and back to the water treatment system for treatment.

A 40-m-long concrete barrier wall was constructed to stop tree roots from penetrating the slab and ensure stability over time, and owing to the site being located near the coast, all structures required marine-grade painting to protect against rust.

The system was refined during the commissioning phase, with continuous data logging enabling adaptive tuning for flow and pH control. Fully automated and managed through a web-based platform, the system allows real-time data access, monitoring and remote adjustment, ensuring highly stable pH discharge levels even under fluctuating flow conditions.

Concrete foundations built for new system
Level 1 pit with barriers
Black water tank and pipes
Concrete landing slab

Discover more projects

Surcharge monitoring of a waste landfill using wireless sensor network

Surcharge monitoring of a waste landfill using wireless sensor network

Site investigation, contamination assessment and remediation of a former chemical plant

Site investigation, contamination assessment and remediation of a former chemical plant

Fluid-filled cable leak: Site of special scientific interest

Fluid-filled cable leak: Site of special scientific interest

In situ thermal desorption in chalk aquifer

In situ thermal desorption in chalk aquifer

Wallasea Island Wild Coast Project

Wallasea Island Wild Coast Project

Pole-mounted transformer catastrophic failure, private residence

Pole-mounted transformer catastrophic failure, private residence

Hydraulic oil spill on wind farm

Hydraulic oil spill on wind farm

Secret Link