We conducted an emergency repair and established an extensive water monitoring programme to protect the sensitive site.


Categories
Emergency response

On 2 November 2026, Ecologia Environmental Solutions, RemedX, RSK Raw, RSK Response and RSK IWS came together as Penta Environmental. The new organisation combines specialist expertise in environmental response, remediation and water treatment, giving clients across the UK access to broader capabilities and greater capacity.

Project overview

RSK Response provided environmental incident support following a fluid-filled cable (FFC) failure impacting an area classified as a site of special scientific interest (SSSI) and a special area of conservation (SAC). The site was also on the coast and affected by periodic tidal flooding from the adjacent estuary.

The 132 kV FFC was damaged when a third-party vehicle drove over the banking where the cable was buried. The resulting pressure caused the cable to fail, causing free phase cable oil to spread.

The solution

Working in partnership with the cable repair contractor and the client, retention booms and absorbents were deployed around the leak location and at set points along nearby watercourses. This helped to contain the free phase oil and prevent a wider impact to the estuary or the sensitive site. These were monitored and adjusted, as necessary, for several months to encompass the entire programme of cable repair work and until the completion of the environmental monitoring programme in key locations.

During periods of low tide and dry weather, oily water removal was undertaken at low points by vacuum extraction on multiple occasions. An extensive water monitoring programme was established at the beginning of the project, which looked at the surface water environment upstream, at various points around the leak location, and down-stream towards the estuary. The monitoring programme continued for nine months after the initial incident occurred, until the water environment showed concentrations of oil to be within limits acceptable to the regulator.

Frequent communication and collaboration between us, the client and the client’s repair contractor meant that impacts to the sensitive site from a natural habitat perspective were kept to a minimum, all to the satisfaction of the regulator.

Discover more projects

Surcharge monitoring of a waste landfill using wireless sensor network

Surcharge monitoring of a waste landfill using wireless sensor network

Site investigation, contamination assessment and remediation of a former chemical plant

Site investigation, contamination assessment and remediation of a former chemical plant

In situ thermal desorption in chalk aquifer

In situ thermal desorption in chalk aquifer

Wallasea Island Wild Coast Project

Wallasea Island Wild Coast Project

Pole-mounted transformer catastrophic failure, private residence

Pole-mounted transformer catastrophic failure, private residence

Hydraulic oil spill on wind farm

Hydraulic oil spill on wind farm

Heating oil leak, Kent

Heating oil leak, Kent

Secret Link