Fluid-filled cable leak: Site of special scientific interest
On 2 November 2026, Ecologia Environmental Solutions, RemedX, RSK Raw, RSK Response and RSK IWS came together as Penta Environmental. The new organisation combines specialist expertise in environmental response, remediation and water treatment, giving clients across the UK access to broader capabilities and greater capacity.
Project overview
RSK Response provided environmental incident support following a fluid-filled cable (FFC) failure impacting an area classified as a site of special scientific interest (SSSI) and a special area of conservation (SAC). The site was also on the coast and affected by periodic tidal flooding from the adjacent estuary.
The 132 kV FFC was damaged when a third-party vehicle drove over the banking where the cable was buried. The resulting pressure caused the cable to fail, causing free phase cable oil to spread.
The solution
Working in partnership with the cable repair contractor and the client, retention booms and absorbents were deployed around the leak location and at set points along nearby watercourses. This helped to contain the free phase oil and prevent a wider impact to the estuary or the sensitive site. These were monitored and adjusted, as necessary, for several months to encompass the entire programme of cable repair work and until the completion of the environmental monitoring programme in key locations.
During periods of low tide and dry weather, oily water removal was undertaken at low points by vacuum extraction on multiple occasions. An extensive water monitoring programme was established at the beginning of the project, which looked at the surface water environment upstream, at various points around the leak location, and down-stream towards the estuary. The monitoring programme continued for nine months after the initial incident occurred, until the water environment showed concentrations of oil to be within limits acceptable to the regulator.
Frequent communication and collaboration between us, the client and the client’s repair contractor meant that impacts to the sensitive site from a natural habitat perspective were kept to a minimum, all to the satisfaction of the regulator.