Heating oil leak, Kent
On 2 November 2026, Ecologia Environmental Solutions, RemedX, RSK Raw, RSK Response and RSK IWS came together as Penta Environmental. The new organisation combines specialist expertise in environmental response, remediation and water treatment, giving clients across the UK access to broader capabilities and greater capacity.
Project overview
On a site in Kent, Kerosene heating oil had escaped from a corroded filter bowl, impacting the underlying soil.
The site was located over a chalk bedrock principal aquifer, as well as a groundwater source protection zone (SPZ II). An additional concern was the presence of two drinking water abstraction wells in close proximity to the site.
As the risk to groundwater was high, Ecologia had to respond rapidly to prevent the contamination of groundwater and water supplies. Close liaison with the Environment Agency was maintained throughout.
The solution
Ecologia undertook an emergency excavation to six metres below ground level. Significant contamination was confirmed to be present at this depth, so additional investigations were needed.
Drilling at the point of loss confirmed that kerosene had migrated to greater depth. Cable percussion and rotary boreholes were drilled and installed to monitor groundwater in the area around the leak.
The result
Groundwater monitoring demonstrated that the kerosene heating oil had not reached the aquifer.
A detailed groundwater quantitative risk assessment was carried out, demonstrating that the residual oil at depth presented a negligible risk of affecting the aquifer in the longer term. Findings were discussed with representatives from the Environment Agency who agreed with Ecologia’s conclusions.
Throughout the project, Ecologia demonstrated a quick response, involving effective removal of the gross contamination, drilling and subsequent groundwater monitoring. This rapid response mitigated impact to the groundwater.
Stakeholder benefits
- Insurers: Prompt and cost-effective mitigation of immediate and long-term liabilities.
- Property owners: Immediate action prevented the requirement for long-term groundwater remediation works.
- Third parties: The impact to water abstractions were prevented.