On 2 November 2026, Ecologia Environmental Solutions, RemedX, RSK Raw, RSK Response and RSK IWS came together as Penta Environmental. The new organisation combines specialist expertise in environmental response, remediation and water treatment, giving clients across the UK access to broader capabilities and greater capacity.
Project overview
RemedX was appointed to design and manage the delivery of a bespoke water treatment system to support enabling works on HS2 Phase One in Birmingham. HS2 represents one of the UK’s largest and most complex infrastructure programmes, transforming rail connectivity between the Midlands and London while driving major economic regeneration across the region.
Groundwater encountered during hydrofraise piling and excavation activities was impacted by suspended solids, hydrocarbons and variable pH, requiring treatment prior to discharge. The objective was to provide a compliant, reliable water treatment solution capable of maintaining discharge consent limits while operating within a constrained and high-risk construction environment. RemedX led the design, health and safety planning and regulatory compliance, supported by specialist equipment supply from sister company GRS.
The solution
RemedX delivered a site-specific water treatment solution designed to manage suspended solids, hydrocarbon contamination and pH variability associated with deep excavation and hydrofraise works. The system incorporated multi-stage treatment, including coagulation and flocculation, solid separation, automated backwashing, pH correction and sand and carbon filtration.
The treatment plant was equipped with automated controls and real-time monitoring of key parameters, including pH and total suspended solids, ensuring continuous compliance with discharge consent conditions. GRS provided specialist treatment equipment, working closely with RemedX to ensure the system met performance and operational requirements.
Operation and maintenance
RemedX and GRS provided on-site training to operational staff to enable safe and effective day-to-day operation of the system. GRS operated under a mobile treatment licence (MTL), ensuring compliance with all relevant environmental legislation. Ongoing performance and compliance were maintained through planned fortnightly operations and maintenance visits and Competence of Operator inspections.
The outcome
The water treatment system has successfully supported critical enabling works on the HS2 Birmingham programme, consistently achieving the required treatment performance and discharge compliance.
By combining RemedX’s design, safety and regulatory expertise with GRS’s specialist equipment capability, the project delivered a robust, compliant and efficient solution aligned with the demands of one of the UK’s most significant infrastructure developments.