In situ remediation of chlorinated solvents and hydrocarbons
On 2 November 2026, Ecologia Environmental Solutions, RemedX, RSK Raw, RSK Response and RSK IWS came together as Penta Environmental. The new organisation combines specialist expertise in environmental response, remediation and water treatment, giving clients across the UK access to broader capabilities and greater capacity.
Project overview
RemedX led the design, management and delivery of a bespoke in situ soil and groundwater remediation scheme in Derry, Northern Ireland. Groundwater encountered during remediation activities was impacted by hydrocarbons and chlorinated solvents, requiring treatment to meet the site-specific target levels and permit requirements.
The objective of the project was to provide a robust, compliant treatment solution capable of managing multiple contaminant types, while operating reliably within an active remediation environment involving both injection of reagents and groundwater abstraction. RemedX acted as the lead contractor, responsible for design coordination, health and safety planning and regulatory compliance, with specialist equipment supply and site management.
The solution
RemedX delivered a site-specific in situ remediation scheme designed to address the complex contaminant profile present in soil and groundwater at the site. The treatment scheme involved the construction of multiple mixing columns, adding reagents using specialist deep soil mixing equipment. Once in the subsurface, the reagents promoted anaerobic degradation of the target chlorinated compound. To manage groundwater during the works, a gated bentonite cut-off wall was constructed coupled with groundwater abstraction to protect the nearby river. The water treatment system incorporated multi-stage processes, including solid separation for suspended solids removal, aeration to promote volatilisation of chlorinated solvents and vapour capture with treatment via activated carbon. Downstream sand and carbon filtration provided further polishing to ensure discharge compliance.
The system was fitted with automated controls and real-time monitoring of key operational parameters, including flow rates, pressure, pH and total suspended solids. This enabled continuous performance monitoring and ensured the system consistently operated within discharge consent limits. GRS, an RSK company, supplied the specialist treatment equipment and supported commissioning to ensure the system met both performance and operational requirements.
Operation and maintenance
RemedX fully managed the reagent injection works and operated and maintained the water treatment system throughout the project, working under a mobile treatment licence to ensure compliance with all relevant Northern Ireland legislation. Remediation performance, environmental compliance and operational safety were maintained through regular operations and maintenance activities and Certificate of Technical Competence inspection visits.
The outcome
The total mass of reagents was successfully injected along the targeted vertical profile as per the design. The water treatment system operated reliably throughout the remediation works, successfully treating impacted groundwater to meet regulatory discharge requirements. By combining RemedX’s design leadership, safety management and regulatory expertise with specialist remediation capability, the project delivered a compliant, effective and well-managed solution that supported the successful progression of on-site remediation activities.